权威例句
Design and Calculation of the Falsework for the Cast-in-place 220 m Span RC Box Section Arch BridgeDesign and Construction Control of the Falsework for Large Span Arch BridgeEconomical falsework solutions for concrete arch bridgesStability Analysis for Demolition of Falsework in Shallow Tunnel with Arch Cover Method in Cracked StrataAnalysis of Risk for Reinforced Concrete Deck Through Arch Bridge Falsework During ConstructionTIMBER-ARCH FALSEWORK FOR CONCRETE ARCH BRIDGESMovable Falsework Speeds Arch Rib ConstructionHeight adjustable support frame for falsework, contains rail supported on vertical sheets attached to plate with sloping foot sheets...Sequential Stressing of Cable-Stayed Bridges Erected on FalseworkSimulation Methods for the Erection of Strained Grid Shells Via Pneumatic Falsework