筛选结果 共找出25

 Which of the following describes a 'basic standard' within the context of budgeting? 

A

 A standard which is kept unchanged over a period of time 

B

 A standard which is based on current price levels 

C

 A standard set at an ideal level, which makes no allowance for normal losses, waste and machine downtime 

D

 A standard which assumes an efficient level of operation, but which includes allowances for factors such as normal loss, waste and machine downtime 

Which of the following statements about standard costing is NOT true? 

A

 Standard costing is useful where products are customised to a customer's specifications. 

B

 Standard costing provides useful information to assist management in controlling costs 

C

 Standard costing makes it easier to value inventory 

D

 Standard costing can be used to predict future costs and set budgets 

 Ideal standards are long-term targets. 

A

 True

B

 False 

 Which of the following best describes a ‘basic standard’ within the context of budgeting? 

A

 A standard which is kept unchanged over a period of time 

B

 A standard which is based on current price levels 

C

 A standard set at an ideal level, which makes no allowance for normal losses, waste and machine downtime  

D

 A standard which assumes an efficient level of operation, but which includes allowances for factors such as normal loss, waste and machine downtime 

The following statements have been made about budgets and standards:

(i) Budgets can be used in situations where output cannot be measured, but standards cannot be used in such situations. 

(ii) Budgets can include allowances for inefficiencies in operations, but standards use performance targets which are attainable under the most favourable conditions.

 (iii) Budgets are used for planning purposes, standards are used only for control purposes. 

Which of the above statements is/are true? 

A

 (i) , (ii) and (iii) 

B

 (i) and (ii) only 

C

 (i) only 

D

 (ii) and (iii) only